Approval Profile
Boiler Registration Certificate
Registration
Operational
Operating Licence Chain
UNVERIFIED
Overview
Registration and fitness certificate for boilers and pressure vessels used in buildings.
When Is This Required?
| Parameter | Condition | Type |
|---|---|---|
| Has Boiler |
equals
true |
Required |
Required Evidence
Output
Validity & Renewal
Duration
12 months
Renewal Cycle
12 months
Renewal Lead Time
30 days before expiry
Lapses on inaction. This approval expires automatically if not renewed.
Legal Basis
Boiler Act 1923 (as amended) UNVERIFIED
Section Section 7 — Registration and Inspection of Boilers
Building360 interpretation — not legal advice: The Boiler Act 1923 requires all boilers to be registered with the Chief Inspector of Boilers and inspected at prescribed intervals. No boiler shall be used unless it holds a valid certificate. The exact text requires verification.
Bangladesh Labour Act 2006 UNVERIFIED
Section Section 71 — Pressure Plant
Where in any establishment any part of the plant or machinery used in manufacturing process is operated at a pressure above the atmospheric pressure, effective measures shall be taken to ensure that the safe working pressure of such part is not exceeded.
Building360 interpretation — not legal advice: Applies to boilers and pressure vessels in factories. Effective measures include regular inspection and registration under the Boiler Act 1923.
Page 35Approval Details
Type
Registration
Issuing Authority
CIB
Lifecycle Phase
Operational
Typical Lead Time
~14 days
Validity
1 year
Applies To
Factory, Hospital, Hotel, Large Commercial
Requirements may vary by jurisdiction and project. Always confirm with the issuing authority.