Data Centres
Data centres house IT infrastructure requiring continuous power, precision cooling, physical security and environmental controls. Assessment focuses on power redundancy (N+1 or 2N configurations), cooling system reliability, fire suppression (clean-agent systems), structural loading for equipment racks, and compliance with international standards such as the Uptime Institute Tier classifications.
Overview
Data centres house IT infrastructure requiring continuous power, precision cooling, physical security and environmental controls. Assessment focuses on power redundancy (N+1 or 2N configurations), cooling system reliability, fire suppression (clean-agent systems), structural loading for equipment racks, and compliance with international standards such as the Uptime Institute Tier classifications.
Assessment Context
Data centres in Bangladesh serve telecommunications providers, banks, government agencies, IT companies and multinational operations. Facilities range from converted office spaces with a few server racks to purpose-built facilities designed to international standards. The reliability requirements for data centres are fundamentally different from other building types — downtime has immediate and measurable financial and operational consequences.
Power Systems
Power is the most critical system in a data centre. Assessment must cover: utility power feed capacity and redundancy, transformer and switchgear configuration, generator systems (capacity, redundancy, fuel storage, automatic start and transfer), UPS systems (capacity, battery condition, bypass capability), power distribution units (PDUs), and electrical monitoring systems. Redundancy is described using N, N+1, or 2N configurations. The level of redundancy determines the facility tier and directly affects availability targets.
Cooling Systems
Server equipment generates significant heat loads. Cooling system assessment includes: total cooling capacity versus IT heat load, cooling distribution (raised-floor, in-row, overhead), redundancy of cooling units, chilled water system condition (if applicable), condensing unit placement and performance, temperature and humidity monitoring, and hot-aisle/cold-aisle containment effectiveness. In Bangladesh, high ambient temperatures and humidity make cooling system design and performance especially critical.
Structural Considerations
Server racks create concentrated floor loads significantly exceeding standard office design loads. A fully loaded 42U rack can weigh 800-1500 kg. Assessment should verify floor slab capacity for rack loads, cable tray support, raised-floor structural adequacy, and the impact of equipment vibration on the building structure. Purpose-built data centres are designed for these loads; converted facilities may not be.
Fire Suppression
Data centres typically require clean-agent fire suppression (such as FM-200 or Novec 1230) rather than water-based sprinkler systems, which would damage IT equipment. Assessment covers: suppression agent type and volume, detection system sensitivity (VESDA or equivalent), zone coverage, agent discharge testing records, and integration with HVAC shutdown on detection. Water-based suppression may still be required in non-IT areas of the building.
Physical Security
Data centres require multi-layer physical security: perimeter protection, building access control, server room access control (often biometric), CCTV surveillance with retention, visitor management, and environmental monitoring. Assessment should verify that security measures do not impede emergency evacuation.
Operational Characteristics
• Extremely high electrical power density per square metre
• Continuous mechanical cooling required to maintain IT equipment temperatures
• Tiered redundancy design (Tier I through Tier IV) determining uptime targets
• Strict environmental controls: temperature, humidity and air cleanliness
• Physical security perimeter with multi-factor access control
Primary Hazards
• Electrical hazards from high-voltage switchgear and battery systems
• Battery room hydrogen gas accumulation (for VRLA or flooded cell UPS)
• Cooling system refrigerant leaks
• Water damage from cooling system failures or flooding
• Structural overloading from server rack weight concentrations
Essential Documents
• Electrical installation safety certificates
• Fire suppression system inspection and test reports
• UPS and generator commissioning and maintenance records
• Cooling system (CRAC/CRAH) maintenance records
• Structural load assessment for raised-floor and rack areas
• Environmental permits for generator emissions and cooling water discharge
Important Systems
• Cooling: precision air conditioning (CRAC/CRAH), chilled water plant, free cooling where applicable
• Fire detection: very early smoke detection apparatus (VESDA) or equivalent
• Fire suppression: clean agent (FM-200, Novec 1230) or inert gas systems
• Building Management System (BMS) and Data Centre Infrastructure Management (DCIM)
• Physical security: mantraps, biometric access, CCTV with retention
• Leak detection under raised floors and around cooling infrastructure
Typical Concerns
• Cooling capacity relative to current and projected IT heat loads
• Single points of failure in power or cooling distribution
• Floor loading capacity for high-density rack deployments
• Fire suppression effectiveness without water damage to equipment
• Physical security and access audit trails
Common Red Flags
• UPS batteries past their service life without replacement
• Hot spots in the server hall indicating cooling distribution failures
• Cable management obstructing airflow under raised floors
• No documented maintenance-of-way procedures for concurrent maintainability
• Fire suppression system concentration test overdue
Suggested Professional Assessments
• Cooling capacity and efficiency assessment (PUE measurement)
• Tier certification or gap analysis against Uptime Institute or equivalent standards
• Fire risk assessment specific to data centre environments
• Structural floor loading assessment
• Physical security penetration test
• Business impact analysis and disaster recovery plan review
Sustainability Considerations
• Free cooling potential based on local climate conditions
• Renewable energy procurement or on-site generation
• Water consumption in evaporative cooling systems
• IT equipment lifecycle management and e-waste disposal
• Heat recovery for adjacent building heating where feasible
• Carbon footprint reporting for Scope 1 (generators) and Scope 2 (grid electricity)
Need Guidance for This Building Type?
Explore our Knowledge Library for related articles or contact us for specific guidance on Data Centres.
Disclaimer: This information is general guidance for the Data Centres building type. Individual buildings vary by age, design, construction, jurisdiction and operational history. Qualified professionals should be engaged for specific building assessments.