Land Use Clearance

Clearance Pre-Offer Building Approval Chain UNVERIFIED

Overview

Clearance confirming the proposed building use is compatible with the designated land use zone in the Detailed Area Plan (DAP).

When Is This Required?

Parameter Condition Type
Building Type in_list Commercial,Residential,Industrial,Institutional,Mixed-Use,Retail,Warehouse,Hospital,School,Hotel,Data Centre,Sports Facility,Bank,Factory Required
Required before construction permit application to confirm land use compatibility with DAP zoning

Required Evidence

Application Input
Title Deed (Dolil) Must Sight Required
Supporting
Output

Validity & Renewal

Duration
Until construction commences or conditions change
Lapse conditions: Construction not commenced within stipulated period

Legal Basis

Town Improvement Act 1953 UNVERIFIED
Section Section 73 — Control of Land Development

Building360 interpretation — not legal advice: The Town Improvement Act 1953 grants development authorities (including RAJUK) the power to control land use and building activities within their jurisdiction. This is the foundational law for land use clearance requirements in Dhaka.

Bangladesh National Building Code (BNBC) 2020 UNVERIFIED
Section Part II, Section 3.2.1 — Validity of Permits from the Date of Issuance
(a) Land use certificate 24 months; (b) Large and specialized project permit 24 months; (c) Building permit 36 months (unless construction up-to plinth level is done); (d) Occupation certificate Perpetual (unless any change in use and physical properties)

Building360 interpretation — not legal advice: Defines the validity periods for each permit type. A building permit lapses after 36 months if plinth-level construction has not begun. An occupancy certificate remains valid perpetually unless the building use or physical properties change.

Page 24
Bangladesh National Building Code (BNBC) 2020 UNVERIFIED
Table Part II, Table 2.3.2 — Time Limit for Disposal of Application for Permits
Land use certificate: 15 days; Large and Specialized Project permit: 45 days; Building permit: 45 days; Occupancy certificate: 15 days

Building360 interpretation — not legal advice: The Building Official must approve or refuse each permit type within the specified time limits. If no response is received within these periods, the application is deemed approved (subject to conditions in Section 3.5.2).

Page 26

Approval Details

Type
Clearance
Issuing Authority
RAJUK
Lifecycle Phase
Pre-Offer
Typical Lead Time
~30 days
Validity
Valid for the specific project application
Applies To
All building types

Requirements may vary by jurisdiction and project. Always confirm with the issuing authority.