Concrete Cube Test Results
Construction & Testing
Must Verify
Pre-Fitout
What It Proves
Concrete used in construction meets the specified compressive strength at 7 and 28 days.
What to Verify
Sample locations cover all pours, 28-day strengths meet specification, failure rate within acceptable limits.
Document Details
Category
Construction & Testing
Trust Level
Must Verify
Document must be independently verified with the issuing authority.
Disqualification Power
Medium
Who Issues
Testing Laboratory
Typical Format
Laboratory test certificates
Lifecycle Phase
Pre-Fitout
Renewal
No — one-time document