Electrical Installation Certificate

Construction & Testing Must Verify Pre-Fitout

What It Proves

Electrical installation has been completed, tested and meets wiring regulation requirements.

What to Verify

Insulation resistance values, earth continuity, RCD trip times, circuit schedule matches installation.

What to Check On-Site

Verify RCD presence at distribution boards matches certificate schedule. Read transformer nameplate against stated sanctioned load. Check earthing visible at main switchboard.

Internal Consistency Checks

Sanctioned load must match or exceed actual connected load. Distribution board schedule must account for all floors. Earthing system type must match earth resistance test report.

Used By Approvals

As Application Input
As Supporting

Legal Basis

Electricity Act 2018 UNVERIFIED
Section Section 35 — Electrical Installation Safety

Building360 interpretation — not legal advice: The Electricity Act 2018 governs electrical safety requirements including load sanction and installation certification. The exact text requires verification.

Document Details

Category
Construction & Testing
Trust Level
Must Verify
Document must be independently verified with the issuing authority.
Disqualification Power
Medium
Who Issues
Licensed Electrician / Electrical Engineer
Typical Format
Test certificate with schedules
Lifecycle Phase
Pre-Fitout
Renewal
No — one-time document
Non-Inferable
This document cannot be inferred from downstream certificates. Must be independently verified.

Document requirements may vary. Always confirm with the issuing authority.