Fire Protection System As-Built Drawings

Construction & Testing Must Verify Pre-Fitout

What It Proves

Fire protection systems (sprinkler, alarm, suppression) have been installed as designed with any field modifications recorded.

What to Verify

Coverage areas complete, no blind spots, modifications documented and approved, hydraulic calculations updated if sprinkler layout changed.

What to Check On-Site

Verify sprinkler head spacing in one zone matches drawings. Check fire alarm panel zone labels match as-built zone plan. Confirm riser locations match drawings.

Used By Approvals

As Application Input
As Supporting

Document Details

Category
Construction & Testing
Trust Level
Must Verify
Document must be independently verified with the issuing authority.
Disqualification Power
Medium
Who Issues
Fire Protection Contractor
Typical Format
As-built drawing set
Lifecycle Phase
Pre-Fitout
Renewal
No — one-time document
Non-Inferable
This document cannot be inferred from downstream certificates. Must be independently verified.

Document requirements may vary. Always confirm with the issuing authority.