Document Profile
Fire Pump Test Report
Testing & Inspection
Must Sight
Operational
Renewal Required
What It Proves
Fire pump starts automatically, delivers rated flow at rated pressure, and all controllers function correctly.
What to Verify
Churn, rated and 150% flow points, comparison to pump curve, auto-start from pressure drop, engine start for diesel.
Document Details
Category
Testing & Inspection
Trust Level
Must Sight
Original document must be physically sighted and checked.
Disqualification Power
Medium
Who Issues
Fire Protection Contractor
Typical Format
NFPA 25 test form
Lifecycle Phase
Operational
Renewal
Yes — periodic renewal required
Document requirements may vary. Always confirm with the issuing authority.