Skip to main content

Fire Risk Assessment

Must Verify Operational Renewal Required

What It Proves

Fire hazards have been identified, risks evaluated, and control measures documented for the premises.

What to Verify

Assessment recent (within 1-2 years), all areas covered, significant findings actioned, review date set.

Legal Basis

Bangladesh National Building Code (BNBC) 2020 UNVERIFIED
Section Part I, Section 5(3) — Expressed Intent of the Code
The expressed intent of this Code is to ensure public safety, health and general welfare insofar as they are affected by the construction, alteration, repair, removal, demolition, use or occupancy of buildings, structures or premises, through structural strength, stability, means of egress, safety from fire and other hazards, sanitation, adequate light, ventilation and energy conservation.

Building360 interpretation — not legal advice: This section defines the scope and purpose of the BNBC, covering structural, fire safety, egress, sanitation, ventilation, and energy conservation requirements.

Page 2

Document Details

Category
Trust Level
Must Verify
Document must be independently verified with the issuing authority.
Disqualification Power
Medium
Who Issues
Fire Safety Consultant
Typical Format
Assessment report
Lifecycle Phase
Operational
Renewal
Yes — periodic renewal required

Document requirements may vary. Always confirm with the issuing authority.