Structural Safety Certificate

Must Verify Operational Renewal Required

What It Proves

Building structure has been assessed and is considered safe for its current use and loading.

What to Verify

Date of assessment, scope (visual or detailed), any reservations or conditions, recommended reinspection period.

Used By Approvals

As Application Input

Legal Basis

Bangladesh Labour Act 2006 UNVERIFIED
Section Section 61(1) — Safety of Building and Machinery
When it appears to a Labour Inspector that any building, or any part thereof, or any road, machinery or plant or internal electrical system of a building an establishment is in a condition which is dangerous to human life or safety, he may, by an order in writing, direct the employer to take such measures as, in his opinion, are required to be taken, within such time as may be specified in the said order.

Building360 interpretation — not legal advice: Labour Inspectors have the authority to order remedial action when a building or its systems are found to be in a dangerous condition. This is the legal basis for the Building Safety Certificate requirement.

Page 32
Bangladesh Labour Act 2006 UNVERIFIED
Section Section 88(b) — Power to Make Rules — Building Strength Certificate
The Government may prohibit the running of any manufacturing process using power in any building until a certificate of strength of such building by a person having such qualification and in such form, as may be prescribed by rules, is reached to the Inspector General.

Building360 interpretation — not legal advice: This section empowers the government to require a structural strength certificate before any powered manufacturing can operate in a building. This is the direct legal basis for the Building Safety Certificate (DIFE) requirement.

Page 42

Document Details

Category
Trust Level
Must Verify
Document must be independently verified with the issuing authority.
Disqualification Power
High
Who Issues
Structural Engineer
Typical Format
Professional certificate/report
Lifecycle Phase
Operational
Renewal
Yes — periodic renewal required
Non-Inferable
This document cannot be inferred from downstream certificates. Must be independently verified.

Document requirements may vary. Always confirm with the issuing authority.