Approved architectural drawings represent the regulatory authority's acceptance of the building design. Understanding their significance helps stakeholders evaluate compliance and document completeness.

Mandatory Architect, Developer Pending

What Approved Architectural Drawings Are

Approved architectural drawings are the set of drawings submitted to and approved by the relevant building authority (in Bangladesh: RAJUK for Dhaka) as part of the construction permit application. They define the legally permitted building: its footprint, height, floor areas, setbacks, FAR (Floor Area Ratio), number of floors, and permitted use. Any deviation from approved drawings is, by definition, an unauthorised construction.

RAJUK Building Plan Approval

Rajdhani Unnayan Kartripakkha (RAJUK)
Approval Reference No. RAJUK/BPA/2024/XXXX
Plot / Holding No. 12/A, Road 5, Block C
Mouza / Survey Sheet Gulshan, CS Plot 234
Building Use Commercial Office
No. of Approved Floors 10 (G+9)
FAR / Coverage FAR 6.5 / Coverage 55%
Setbacks (Front/Side/Rear) 4.5m / 2.0m / 2.0m
Approval Date 15 March 2024
Validity 2 years from approval date

What Approved Drawing Sets Include

DrawingShowsWhy It Matters
Site planBuilding footprint on plot, setbacks, road access, adjacent propertiesVerifies compliance with zoning setback and coverage requirements
Floor plans (all floors)Room layouts, dimensions, staircases, lifts, toilet locations, emergency exitsVerifies FAR compliance, emergency egress, accessibility, occupancy capacity
ElevationsExternal facade appearance from all sides, building heightVerifies height compliance, facade materials, signage positions
SectionsVertical cut through building showing floor-to-floor heights, basement depthVerifies structural clearances, ceiling heights, basement construction
Roof planRoof layout, drainage, equipment locations, stair head accessVerifies permitted rooftop structures (water tanks, lift machine rooms)

RAJUK Approval Process (Dhaka)

  1. Architect prepares drawings per BNBC requirements and RAJUK Development Control rules
  2. Application submitted with land ownership documents, soil test report, structural design
  3. RAJUK reviews for compliance with DAP (Detailed Area Plan), setbacks, FAR, height limits
  4. If compliant, RAJUK issues construction permit with approved drawings stamped and signed
  5. Approved drawings are the legal baseline — construction must follow them
  6. Any modification requires re-approval (which is rarely obtained for minor changes)

Key Parameters to Verify

ParameterWhat to CheckWhy
FAR (Floor Area Ratio)Total floor area ÷ plot area ≤ permitted FARExceeding FAR = unauthorised construction
Building heightActual height ≤ approved heightExtra floors = unauthorised
SetbacksFront, rear, side distances from property line ≥ RAJUK minimumSetback violation affects fire safety and neighbour rights
Ground coverageFootprint ÷ plot area ≤ permitted coverageOver-coverage reduces open space and emergency access
Number of floorsActual floors ≤ approved floorsAdditional floors may exceed structural design capacity
Permitted useCommercial / residential / mixed — as approvedUse change requires re-approval

Common Deviations (Bangladesh Reality)

  • Extra floors: Approved for 8 floors, built 10. Extremely common in Dhaka. Creates structural, fire, and legal risk.
  • Setback encroachment: Building extends into required setback space. Affects fire access, ventilation, neighbour light.
  • Basement expansion: Approved for 1 basement, built 2 or 3. Affects structural loads and waterproofing.
  • Use change: Approved as residential, used as commercial. Affects parking, fire safety, utility loads.
  • Rooftop structures: Unauthorised rooftop construction (additional floor disguised as "water tank room").

Due Diligence Implications

During pre-lease or pre-acquisition due diligence, approved architectural drawings should be compared against the actual building. Major deviations are red flags that indicate:

  • The building may not have a valid occupancy certificate
  • Structural design may be inadequate for actual loads
  • Fire safety systems may be undersized for actual floor area
  • Insurance validity may be compromised
  • Regulatory enforcement action is possible (demolition orders have been issued in Dhaka)

References

  1. BNBC 2020 — Part 2: Administration and Enforcement
  2. RAJUK — Rajdhani Unnayan Kartripakkha
  3. Dhaka Building Construction Rules (RAJUK Development Control)
  4. ASTM E2018 — Property Condition Assessment (document review section)

Insights & Guidance

  • Approved drawings define the legally permitted building — any deviation is unauthorised construction.
  • Key parameters: FAR, height, setbacks, ground coverage, number of floors, permitted use.
  • Extra floors beyond approval are extremely common in Dhaka — a serious structural and legal risk.
  • During due diligence, compare approved drawings to actual building — major deviations are deal-breakers.
  • RAJUK approval stamp and signature on drawings = legally approved. Unstamped drawings are not official.

If the building deviates from approved drawings, every downstream claim about the building's legality and safety is compromised. Extra floors may exceed the structural engineer's design capacity. Changed uses may overwhelm fire safety systems. Setback violations affect emergency access. In Dhaka, RAJUK has issued demolition orders for buildings with major deviations. For MNC tenants, occupying an unauthorised building is a corporate governance and reputational risk.

  • Structural failure — extra floors beyond structural design capacity. This has caused building collapses in Bangladesh.
  • Demolition order — RAJUK has authority to order demolition of unauthorised construction.
  • Insurance void — insurer may deny claims for buildings with major plan deviations.
  • No occupancy certificate — buildings with deviations cannot obtain occupancy certificates.
  • Legal disputes — ownership and tenancy disputes when building legality is challenged.

  • RAJUK-stamped approved architectural drawings (all sheets)
  • Construction permit with approved date and permit number
  • Any modification approvals (if building was altered after original approval)
  • Occupancy certificate (confirms building was inspected and matches approval)

  • Count the floors — do they match the approved drawings?
  • Check setbacks — is the building built to the property line?
  • Rooftop — any construction that looks like an additional floor?
  • Ground floor use — does it match what was approved?

  • Can you provide the RAJUK-approved architectural drawings?
  • Does the building as-built match the approved drawings?
  • Were any floors added or modifications made after approval?
  • Has an occupancy certificate been obtained?
  • Is the current use consistent with the approved use?

  • Plan deviation assessment — architect to compare approved drawings against actual building.
  • Regularisation — if deviations exist, architect/RAJUK consultant to explore regularisation options.
  • Structural assessment — structural engineer if extra floors or major deviations found.
Was this page helpful?
|

Related Articles

MEP As-Built Documentation

Why mechanical, electrical, and plumbing as-built drawings and documentation are essential for building operations, maintenance, and due diligence, with guidance on what should exist and how to verify accuracy.

Electrical Safety Certificates and Documentation

Essential electrical documentation for building safety and compliance, from installation certificates to periodic inspection reports, with practical guidance on what each document proves.

Structural Inspection Reports and Certificates

Understanding structural assessment documentation from initial design certificates to periodic inspection reports, what they prove, and why they are critical for building safety and due diligence.

Disclaimer: This article provides educational information and preliminary guidance. It does not constitute professional engineering advice, structural certification, fire-safety approval, legal advice or statutory approval. Building conditions vary by jurisdiction, design, construction and operation. Qualified professionals and relevant authorities should be engaged where required.