Utilities in Bangladesh: WASA, DPDC, DESCO, Titas — Connections, Capacity, and Reliability

Guide to utility services for buildings in Bangladesh — water supply (WASA), electricity (DPDC/DESCO/BPDB), gas (Titas), connection processes, capacity planning, reliability challenges, and backup strategies.

Mandatory Building Owner, FM Team Pending

Utility Landscape

Utility services — electricity, water, and gas — are fundamental to building operation. In Bangladesh, utility reliability, capacity, and connection processes present unique challenges that significantly affect site selection, building design, and operational planning.

Electricity: DPDC, DESCO, BPDB

ProviderAreaWebsite
DPDC (Dhaka Power Distribution Co.)Dhaka South, parts of Dhaka Northdpdc.org.bd
DESCO (Dhaka Electric Supply Co.)Parts of Dhaka North (Mirpur, Uttara, Tongi)desco.org.bd
BPDB (Bangladesh Power Development Board)Outside Dhaka + rural electrificationbpdb.gov.bd

Connection Types

TypeVoltageCapacityTypical Use
LT Single Phase230VUp to 25 kWSmall shops, residences
LT Three Phase400VUp to 200 kWOffices, small commercial
HT Connection11kV or 33kV200 kW+Large commercial, industrial, data centres

Reliability and Backup

AspectCurrent RealityBuilding Impact
Load shedding2-6 hours daily (varies by area and season)Generator is essential for any commercial building
Voltage fluctuationCommon — especially in older grid areasVoltage stabilisers needed for sensitive equipment
Power qualityHarmonic distortion in industrial areasUPS with line conditioning for IT equipment
New connection2-6 months for LT, 6-12 months for HTPlan utility connections early in project timeline

Generator Sizing Rule of Thumb

  • Office: 15-20 kVA per 100 m² (for AC, lighting, IT — excludes central chiller)
  • With central AC: 30-40 kVA per 100 m² (chiller adds significant load)
  • Fuel autonomy: Minimum 8 hours at full load — 24-48 hours for critical operations
  • ATS: Automatic Transfer Switch for seamless grid-generator changeover

Water: WASA

AspectDetail
ProviderDWASA (Dhaka), CWASA (Chittagong), KWASA (Khulna)
Websitedwasa.org.bd
Supply hoursIntermittent — typically 2-6 hours/day in many areas
Water qualityVariable — not consistently potable from tap. Treatment recommended.
BackupUnderground + rooftop storage tanks essential. Deep tubewell as secondary source.
Storage sizingMinimum 2 days consumption in storage (underground + overhead combined)
Connection timeline1-3 months for new connection

Water Planning for Buildings

  • Office consumption: 45-60 litres/person/day (including toilets, pantry, cleaning)
  • Storage calculation: Workers × 60 L/day × 2 days = storage capacity needed
  • Pump system: Transfer pump (underground to overhead) + booster pump (for upper floors in high-rise)
  • Water treatment: UV or RO treatment for drinking water. Iron removal filter if borehole water used.
  • Testing: Annual bacteriological + chemical water quality test from ICDDR,B or BUET lab

Gas: Titas

AspectDetail
ProviderTitas Gas T&D Co. (Dhaka, Mymensingh), other companies for other regions
AvailabilityNew industrial gas connections suspended/restricted in recent years
Supply pressureLow pressure issues common — affects cooking, heating, manufacturing
Building useTypically: canteen cooking, water heating, some manufacturing processes
SafetyGas leak detection, proper ventilation, approved fittings required
AlternativeLPG cylinder or bulk LPG for areas without piped gas

Utility Planning Checklist for New Sites

#ItemAction
1Electricity — confirm provider and available capacityContact DPDC/DESCO/BPDB before lease signing
2Electricity — LT or HT connection needed?Calculate total connected load including HVAC
3Generator — capacity and fuel supplySize for full building load or critical loads only
4Water — WASA supply availabilityCheck supply schedule for the area
5Water — storage capacityVerify underground + overhead tank sizes vs demand
6Water — deep tubewell availabilityCheck groundwater table and quality in the area
7Gas — availability and pressureContact Titas for connection feasibility
8Sewerage — WASA sewer or septic?Verify sewer connection or septic system adequacy

References

  1. DPDC — Dhaka Power Distribution Company
  2. DESCO — Dhaka Electric Supply Company
  3. DWASA — Dhaka Water Supply and Sewerage Authority
  4. BPDB — Bangladesh Power Development Board
  5. Titas Gas Transmission and Distribution Company

Insights & Guidance

  • Electricity: load shedding (2-6 hrs/day) makes generators essential. HT connection (11kV+) needed for large commercial buildings.
  • Water: WASA supply is intermittent — 2 days storage capacity is minimum. Annual water quality testing essential.
  • Gas: new industrial connections restricted. LPG is the alternative for areas without piped gas.
  • Generator sizing: 15-20 kVA/100m² (office without central AC), 30-40 kVA/100m² (with central AC).
  • Plan utility connections early — HT electricity can take 6-12 months. Don't assume utility availability.

Utility reliability directly affects building operation, business continuity, and occupant comfort. In Bangladesh, where grid power is intermittent, water supply is inconsistent, and gas pressure is low, utility planning is not optional — it is a critical part of site selection and building management.

  • Insufficient generator capacity — building cannot operate during load shedding.
  • No water storage — building runs out of water during WASA off-hours.
  • Assumed utility availability — signing a lease only to discover HT connection takes 12 months.

  • Electricity connection agreement and sanctioned load
  • Generator capacity certificate and fuel contract
  • WASA connection and water storage capacity
  • Water quality test report (annual)

  • Generator room: capacity, fuel tank, maintenance condition
  • Water tanks: capacity, cleanliness, pump condition
  • Electrical panel: sanctioned load, actual load, capacity headroom

  • What is the sanctioned electricity load? Is it sufficient for current/planned occupancy?
  • What is the generator capacity and fuel autonomy?
  • How many hours per day does WASA supply water? What is the storage capacity?

  • Electrical design — licensed electrical engineer for load calculation and connection application.
  • Water treatment — water quality consultant for treatment system design.
  • Generator — mechanical engineer for sizing, fuel system, and emission compliance.
Was this page helpful?
|

Related Articles

Vendor and Contractor Due Diligence for Buildings

How to evaluate, select, and manage building service contractors and vendors, covering prequalification, contract structures, performance monitoring, and compliance requirements.

Service Charge Analysis for Commercial Buildings

How to evaluate, benchmark, and negotiate service charges in commercial leases, covering what should be included, common disputes, and best practice transparency standards.

Space Management and Utilisation: Measuring How Buildings Are Actually Used

How to measure and manage space utilisation in commercial buildings including measurement methods, occupancy sensors, utilisation benchmarks, cost per occupied seat, and how space data drives real estate decisions.

Disclaimer: This article provides educational information and preliminary guidance. It does not constitute professional engineering advice, structural certification, fire-safety approval, legal advice or statutory approval. Building conditions vary by jurisdiction, design, construction and operation. Qualified professionals and relevant authorities should be engaged where required.