Pre-lease due diligence is the systematic process of investigating a building before signing a lease. Understanding what to examine and why helps organisations protect their interests.

Good Practice CRE Team, Legal Advisor Pending

What Pre-Lease Due Diligence Means

Pre-lease due diligence is the systematic investigation of a building's physical condition, regulatory compliance, ownership, and operational adequacy before signing a lease agreement. It protects the tenant from inheriting safety risks, hidden costs, and operational limitations that only become apparent after occupancy.

In mature markets, pre-lease DD is standard practice supported by professional services (property condition assessments, environmental assessments, title searches). In Bangladesh, the practice is less established — but the risks are higher, making DD more important, not less.

Due Diligence Components

1. Legal & Title

  • Verify the landlord is the legal owner or authorised agent (land title deed, mutation records).
  • Confirm the building has RAJUK construction approval and occupancy/completion certificate.
  • Check for any liens, encumbrances, or pending litigation on the property.
  • Verify the land use is zoned for commercial/office use (not residential or agricultural).

2. Regulatory Compliance

DocumentIssuing AuthorityWhat It ConfirmsStatus to Verify
Construction PermitRAJUK / City CorporationBuilding was approved for constructionExists, matches current building
Occupancy CertificateRAJUK / City CorporationBuilding was inspected and approved for useExists, matches current use
FSCD Fire Safety CertificateFire Service & Civil DefenceFire safety systems meet requirementsCurrent (renewed annually)
Trade LicenceCity CorporationBusiness operation permitted at this locationCurrent for landlord's commercial activity
Environmental ClearanceDoEEnvironmental compliance (if applicable)Applicable for industrial/factory use

3. Physical Condition

  • Structural: Age, design code, condition assessment, floor load capacity, seismic adequacy.
  • Fire safety: Sprinklers, detection, alarm, exits, compartmentation, fire pump, water supply.
  • Electrical: Incoming supply, generator capacity/fuel autonomy, ATS, earthing, RCDs, condition report.
  • HVAC: System type, capacity, condition, ventilation rate, maintenance regime.
  • Lifts: Count, capacity, age, condition, maintenance contract, availability record.
  • Plumbing: Water supply source/reliability, storage capacity, drainage connection, water quality.
  • Envelope: Roof condition, facade condition, leak history, ACP type if applicable.

4. Operational Assessment

  • Building management team — in-house or outsourced? Qualifications? Staffing level?
  • Service charge — what's included? How is it calculated? Historical increases?
  • Maintenance records — PPM schedules, equipment condition, capital replacement forecast.
  • Incident history — fires, floods, structural issues, lift entrapments, security incidents.
  • Other tenants — who else occupies the building? Any conflicts (e.g., restaurant exhaust, industrial activity)?

DD Timeline

PhaseDurationActivities
Document requestWeek 1Send document checklist to landlord, schedule site visit
Desktop reviewWeek 2Review documents received, identify gaps and concerns
Site inspectionWeek 2–3Structured walkthrough + specialist assessments
Specialist reportsWeek 3–5Structural, fire, electrical assessments completed
Gap analysis & reportWeek 5–6Compile findings, score building, recommend action
NegotiationWeek 6–8Use findings to negotiate lease terms and landlord works

Total: 6–8 weeks. Allow 8–12 weeks if specialist assessments require scheduling.

Key Lease Provisions Informed by DD

  • Landlord remediation schedule — specific works the landlord must complete before or within X months of lease commencement, with penalty for delay.
  • Structural warranty — landlord warrants the building is structurally adequate for office use at stated floor loading.
  • Fire compliance warranty — landlord maintains valid FSCD certificate throughout the lease term.
  • Service charge cap — annual increase capped at CPI + X% or fixed percentage.
  • Generator fuel — landlord provides minimum hours of backup power; shortfall is a service failure.
  • Right to audit — tenant has right to inspect and audit building systems, maintenance records, and compliance documents.
  • Termination for safety — tenant may terminate if building becomes unsafe or non-compliant and landlord fails to remediate within agreed timeline.

Bangladesh Context

  • Many landlords will resist providing documentation — persistence is required. Missing documents are themselves a finding.
  • Title verification is complex in Bangladesh — engage a local property lawyer for land title search and encumbrance check.
  • RAJUK approval and occupancy certificates may not exist for older buildings or buildings outside RAJUK jurisdiction. This is a gap, not necessarily a deal-breaker — but it must be documented.
  • Service charges in Dhaka are often opaque — insist on transparency and breakdown.

References & Sources

  1. ASTM E2018 — Property Condition Assessments
  2. RICS Red Book — Valuation Standards
  3. RAJUK — Building Approval Authority
  4. FSCD — Fire Safety Certification
  5. ISO 31000 — Risk Management

Insights & Guidance

  • Pre-lease DD should take 6–8 weeks and cover legal/title, regulatory, physical condition, and operational assessment.
  • Missing documents are themselves a finding — they indicate gaps the tenant must manage.
  • DD findings directly inform lease negotiations: landlord works, warranties, service charge caps, termination rights.
  • In Bangladesh, title verification requires a property lawyer; RAJUK/FSCD certificates should be verified as current.
  • A structured DD process prevents costly surprises after lease signing.

Without pre-lease DD, tenants inherit every building deficiency at their own risk. Remediation costs discovered post-lease often exceed the entire fit-out budget. In Bangladesh, where building quality varies enormously, DD is the only way to understand what you are actually leasing — and to negotiate accordingly.

  • Undisclosed structural issues — tenant discovers floor loading is insufficient for planned use after fit-out is complete.
  • No FSCD certificate — discovered during corporate audit; forced to evacuate or remediate at tenant cost.
  • Service charge escalation — uncapped charges increase 30–50% in year 2 with no recourse.
  • Title dispute — landlord doesn't have clear title; tenant loses access during legal proceedings.
  • Flooding history — landlord didn't disclose; first monsoon floods the ground floor.

  • Land ownership deed (recorded with Sub-Registrar)
  • RAJUK construction permit and occupancy certificate
  • Current FSCD Fire Safety Certificate
  • Structural design drawings or condition assessment
  • Electrical EICR or equivalent condition report
  • HVAC maintenance records
  • Lift inspection certificates
  • Service charge budget and historical actuals

  • Overall building maintenance standard — lobby, lifts, washrooms, stairways.
  • Fire exit condition — unobstructed, signed, panic hardware functional.
  • Electrical rooms — condition, labelling, housekeeping.
  • Common area MEP — HVAC noise, lighting quality, water pressure.
  • Other tenant spaces — are they well-maintained? What sectors are they in?
  • External — parking, access roads, flood drainage, security perimeter.

  • Can you provide the RAJUK construction permit and occupancy certificate?
  • Is the FSCD Fire Safety Certificate current? When does it expire?
  • What is the service charge per square foot? What does it include? What's the historical annual increase?
  • Has a structural condition assessment been conducted? Can I see the report?
  • What capital expenditure is planned for the next 5 years?
  • Has the building experienced any fire, flood, or structural incidents?
  • Who manages the building? What is the staffing level?
  • Can I speak with an existing tenant about their experience?

  • Title verification — property lawyer with Bangladesh land law expertise.
  • Physical condition — MEP engineer for building systems assessment per ASTM E2018.
  • Fire safety — fire consultant for compliance audit against NFPA/BNBC.
  • Structural — structural engineer for condition assessment if no recent report exists.
  • Lease negotiation — CRE advisor familiar with Dhaka market.
Was this page helpful?
|

Related Articles

Vendor and Contractor Due Diligence for Buildings

How to evaluate, select, and manage building service contractors and vendors, covering prequalification, contract structures, performance monitoring, and compliance requirements.

Service Charge Analysis for Commercial Buildings

How to evaluate, benchmark, and negotiate service charges in commercial leases, covering what should be included, common disputes, and best practice transparency standards.

Space Management and Utilisation: Measuring How Buildings Are Actually Used

How to measure and manage space utilisation in commercial buildings including measurement methods, occupancy sensors, utilisation benchmarks, cost per occupied seat, and how space data drives real estate decisions.

Disclaimer: This article provides educational information and preliminary guidance. It does not constitute professional engineering advice, structural certification, fire-safety approval, legal advice or statutory approval. Building conditions vary by jurisdiction, design, construction and operation. Qualified professionals and relevant authorities should be engaged where required.