Site Selection Criteria: The Professional's Evaluation Framework

A structured framework for evaluating office, factory, and warehouse sites — covering location, structural adequacy, safety compliance, power reliability, environmental risk, accessibility, and the gap between MNC expectations and local market reality.

Good Practice CRE Team Pending

Why Site Selection Is a Technical Decision

Site selection is not just about location and rent. A building that looks modern and affordable may have structural deficiencies, inadequate power supply, no fire protection, or regulatory gaps that create operational risk for years. Professional site selection requires evaluating at least 15 criteria — and knowing which are negotiable and which are deal-breakers.

The 15 Site Selection Criteria

#CriterionMNC ExpectationLocal NormMinimum Acceptable
1Structural AdequacyStructural report, code-compliant designTrust the developerStructural PE assessment
2Fire & Life SafetyNFPA-compliant systems, fire licenceExtinguishers onlyDetection + 2 exit stairs + fire licence
3Electrical SafetyIEC-compliant, earthing testedFunctional powerEarth test certificate, RCD protection
4Power ReliabilityDual feed + UPS + generator (N+1)Generator onlyGenerator with ATS + fuel contract
5HVAC AdequacyCentral plant, ASHRAE 62.1 ventilationSplit unitsAdequate cooling + fresh air
6LiftsEN 81 compliant, maintained by OEMFunctional liftsAnnual safety inspection, maintained
7Floor LoadingCertified capacity (kN/m²)Standard construction2.5 kN/m² office, 5.0+ warehouse
8Ceiling Height≥2.75m clear (office), ≥6m (warehouse)2.4-2.6m≥2.7m office, ≥5m warehouse
9Floor Plate Efficiency≥70% NIA/GIA ratioNot measured≥65% efficiency
10Parking1:1000 sq ft minimumLimited street parkingAdequate for staff + visitors
11AccessibilityADA/EN 17210 compliantNo provisionRamp + accessible toilet minimum
12Flood RiskAbove 100-year flood levelNot assessedHistorical flood data reviewed
13Seismic ZoneBNBC 2020 zone-appropriate designOlder code or unknownConfirm design code vintage
14Regulatory ComplianceAll permits current and verifiedPartial permitsOccupancy certificate + fire licence
15Lease Terms5-10yr, defined maintenance scope, escalation cap1-3yr, verbal agreementsWritten lease, clear scope of responsibilities

Deal-Breakers vs Negotiables

Non-Negotiable (Walk Away)

  • No occupancy certificate or building approval
  • Extra floors beyond approved design (structural overload risk)
  • No fire exits (only one staircase or locked exit doors)
  • Active structural distress — visible cracks in columns, significant deflection, water damage to structural elements
  • No generator and unreliable grid power (>2 hours daily outage)
  • History of flooding in the building

Negotiable (Fix Before or After Occupancy)

  • Missing fire detection system — can be installed by tenant
  • HVAC inadequacy — can supplement with additional units
  • Electrical earthing not tested — test and remediate
  • Accessibility deficiencies — ramp and accessible toilet can often be added
  • Poor lighting — can be replaced
  • No BMS — can install smart metering

Office Site Selection Scoring

CategoryWeightWhat to Assess
Safety & Compliance30%Structural report, fire systems, electrical safety, permits
Technical Adequacy25%Power, HVAC, lifts, floor loading, ceiling height, efficiency
Location & Access20%Commute, parking, public transport, neighbourhood, flood risk
Commercial Terms15%Rent, tenure, escalation, fit-out contribution, maintenance scope
Expansion & Flexibility10%Growth space, floor plate divisibility, sub-let rights

Factory & Warehouse Additional Criteria

CriterionFactoryWarehouse
Clear height≥5m production, ≥7m storage≥8m, preferably ≥10m
Column spacing≥9m × 9m≥12m × 24m preferred
Floor loading5-10 kN/m² production≥5 kN/m², 30 kN/m² for racking
Power supplyHT connection (11kV/33kV)LT may suffice
Gas supplyOften essential (Titas)Rarely needed
ETPRequired for wet processesRarely needed
Loading docksDrive-in or dock levelCross-dock preferred
EPZ/SEZBEPZA/BEZA zone benefitsConsider if export-oriented
Labour zoneProximity to workforceProximity to logistics hub

Site Selection Process

  1. Requirements brief: Headcount, area, technical requirements, budget, location preferences, timeline
  2. Long list: 8-12 options from agents, direct search, referrals
  3. Desk screening: Eliminate based on location, size, budget, obvious red flags → shortlist of 4-6
  4. Site visits: Technical walk-through with checklist — 2 hours minimum per site
  5. Technical assessment: Structural, fire, electrical, HVAC evaluation of top 2-3 options
  6. Commercial negotiation: Terms, fit-out scope, maintenance responsibilities
  7. Management approval: Score comparison matrix, risk register, recommendation
  8. Lease execution and fit-out planning

Bangladesh-Specific Considerations

  • RAJUK approval: Verify building has RAJUK-approved plan matching actual construction. Extra floors are common — and a structural risk.
  • Fire licence: Issued by FSCD after inspection. Many commercial buildings operate without one. For MNC tenants, this is essential.
  • Power: Dhaka grid reliability has improved but 2-4 hour daily load-shedding is still common outside premium areas. Generator is essential. Verify fuel supply contract.
  • Flood zones: Dhaka has well-documented flood zones. Buildings on filled wetland (particularly Badda, Aftabnagar, parts of Uttara) face seasonal waterlogging. Check LGED flood maps.
  • Seismic: Dhaka is in BNBC Seismic Zone 2 (Z=0.20). Verify buildings were designed to adequate seismic code — pre-2006 buildings likely used lower seismic factors.
  • Traffic access: In Dhaka, commute time is often the dominant site selection criterion. Consider proximity to staff residential areas, not just prestige address.

References

  1. CBRE — Site Selection and Advisory Services
  2. JLL — Occupier Advisory and Site Selection
  3. ASTM E2018 — Property Condition Assessment Standard
  4. RICS — Property Measurement and Due Diligence Standards
  5. NFPA — Fire Protection Standards
  6. ASHRAE — HVAC Design Standards
  7. BNBC 2020 — Bangladesh National Building Code
  8. RAJUK Development Control Rules

Insights & Guidance

  • Professional site selection evaluates at least 15 criteria — not just location and rent.
  • Safety & compliance should carry 30% weight — it's the most common source of regret in building selection.
  • Know your deal-breakers: no occupancy certificate, extra floors, no fire exits, active structural distress, chronic flooding — walk away.
  • MNC expectations differ significantly from local norms — understand the gap and decide where your organisation sits.
  • In Bangladesh, verify RAJUK approval, fire licence, generator capacity, and flood zone before anything else.
  • Use a scoring matrix to compare options objectively — it transforms a subjective decision into a defensible recommendation.

A bad site selection decision locks an organisation into operational risk for years. The building you choose determines your safety exposure, energy costs, staff satisfaction, business continuity capability, and regulatory compliance status. Getting it right requires systematic evaluation — not just a property tour and a rent negotiation.

  • Location bias — choosing a prestigious address with poor building quality over a better building in a less fashionable location.
  • Rent-driven decisions — cheap rent often means missing fire systems, poor power, or structural questions.
  • Incomplete assessment — visiting the lobby and conference room, not the electrical room, roof, and fire exits.

  • Site selection scoring matrix with weighted criteria
  • Technical assessment report for shortlisted buildings
  • Compliance verification (permits, licences, certificates)
  • Risk register for selected building

  • Walk the building top to bottom: roof, plant room, electrical room, fire exits, basement, car park
  • Check every staircase — are doors locked? Are exit signs lit? Are routes clear?
  • Visit the generator room — is it maintained? Is there fuel?

  • Can I see the RAJUK-approved building plan? Does the current building match it?
  • What is the generator capacity and fuel autonomy?
  • When was the last fire safety inspection by FSCD?

  • Structural assessment — licensed structural engineer (PE) for any building over 5 floors or with visible distress.
  • Fire assessment — fire protection engineer for any building over 10 floors or high-occupancy.
  • Property condition — ASTM E2018 PCA assessor for acquisition due diligence.
Was this page helpful?
|

Related Articles

Vendor and Contractor Due Diligence for Buildings

How to evaluate, select, and manage building service contractors and vendors, covering prequalification, contract structures, performance monitoring, and compliance requirements.

Service Charge Analysis for Commercial Buildings

How to evaluate, benchmark, and negotiate service charges in commercial leases, covering what should be included, common disputes, and best practice transparency standards.

Space Management and Utilisation: Measuring How Buildings Are Actually Used

How to measure and manage space utilisation in commercial buildings including measurement methods, occupancy sensors, utilisation benchmarks, cost per occupied seat, and how space data drives real estate decisions.

Disclaimer: This article provides educational information and preliminary guidance. It does not constitute professional engineering advice, structural certification, fire-safety approval, legal advice or statutory approval. Building conditions vary by jurisdiction, design, construction and operation. Qualified professionals and relevant authorities should be engaged where required.