Search Building360
Find articles, glossary terms, authorities, standards, approvals, frameworks and more.
4 results for “HVAC” · Handover stage
Why As-Built Information Matters
As-built drawings and records document what was actually constructed, which may differ from the original design. This information is essential for safe maintenance, renovation and assessment.
Building Handover and Defects Liability
The handover from construction to operation is a critical transition. Understanding what should happen during handover helps ensure that the building is properly documented and free of significant defects.
As-Built Drawings Explained
As-built drawings record what was actually constructed, which may differ from the original design. They are among the most important and frequently missing building documents.
MEP As-Built Documentation
Why mechanical, electrical, and plumbing as-built drawings and documentation are essential for building operations, maintenance, and due diligence, with guidance on what should exist and how to verify accuracy.