Architectural Drawings (Approved)

Planning & Design Must Sight Pre-Fitout

What It Proves

Building design has been reviewed and approved by the development authority for code compliance.

What to Verify

Approval stamp and date, revision matches as-built, setbacks and FAR within limits, all floors shown.

What to Check On-Site

Count visible floors against approved drawing. Measure setbacks at ground level. Compare building footprint to site plan. Check that main entrance, stairwell positions, and corridor widths match drawings.

Used By Approvals

As Application Input

Document Details

Category
Planning & Design
Trust Level
Must Sight
Original document must be physically sighted and checked.
Disqualification Power
Medium
Who Issues
Architect (approved by RAJUK)
Typical Format
Stamped drawing set (A1/A0)
Lifecycle Phase
Pre-Fitout
Renewal
No — one-time document

Document requirements may vary. Always confirm with the issuing authority.