Building Construction Permit

Permit Pre-Fitout Building Approval Chain UNVERIFIED

Overview

The primary permit authorising new building construction, alteration or extension. Requires submission of architectural, structural and MEP drawings.

When Is This Required?

Parameter Condition Type
Building Type in_list Commercial,Residential,Industrial,Institutional,Mixed-Use,Retail,Warehouse,Hospital,School,Hotel,Data Centre,Sports Facility,Bank,Factory Required
Required for all new construction and major structural modifications in Dhaka metropolitan area under RAJUK jurisdiction

Prerequisite Chain

Land Use Clearance
Historical OK
Environmental Clearance Certificate
Conditional Must Be Valid
Required when project falls in Red/Orange environmental category
Height Clearance NOC
Conditional Historical OK
Required when building is near airport or in flight path zone
Fire NOC for Construction
Conditional Historical OK
Typically required for buildings above 6 floors or with fire risk characteristics

Dependency Graph

Loading dependency graph...

Required Evidence

Application Input
Structural Design Report Must Verify Required
Soil Investigation Report Must Verify Required
Supporting
Fire NOC (Design Stage) Must Sight Required
Output
Building Construction Permit Must Sight Optional

Validity & Renewal

Duration
24 months
Lapse conditions: Extension required if construction not completed within stipulated period

Legal Basis

Bangladesh National Building Code (BNBC) 2020 UNVERIFIED
Section Part II, Section 3.1 — Permits
No building or structure regulated by this Code shall be erected, constructed, enlarged, altered, repaired, moved, improved, removed, converted or demolished without obtaining permit for each such work from the Building official.

Building360 interpretation — not legal advice: This establishes the fundamental legal requirement for a building construction permit before any construction activity in Bangladesh.

Page 23
Bangladesh National Building Code (BNBC) 2020 UNVERIFIED
Section Part II, Section 3.2.1 — Validity of Permits from the Date of Issuance
(a) Land use certificate 24 months; (b) Large and specialized project permit 24 months; (c) Building permit 36 months (unless construction up-to plinth level is done); (d) Occupation certificate Perpetual (unless any change in use and physical properties)

Building360 interpretation — not legal advice: Defines the validity periods for each permit type. A building permit lapses after 36 months if plinth-level construction has not begun. An occupancy certificate remains valid perpetually unless the building use or physical properties change.

Page 24
Bangladesh National Building Code (BNBC) 2020 UNVERIFIED
Table Part II, Table 2.3.2 — Time Limit for Disposal of Application for Permits
Land use certificate: 15 days; Large and Specialized Project permit: 45 days; Building permit: 45 days; Occupancy certificate: 15 days

Building360 interpretation — not legal advice: The Building Official must approve or refuse each permit type within the specified time limits. If no response is received within these periods, the application is deemed approved (subject to conditions in Section 3.5.2).

Page 26
Bangladesh National Building Code (BNBC) 2020 UNVERIFIED
Section Part II, Section 21(1)-(2) — Powers and Duties of the Building Official
The Building Official shall be authorized to enforce all the provisions of this Code and for such purposes the Building Official shall have the power of a law enforcing officer. Applications shall be made in writing to the Building Official for any erection, construction, addition, alteration, modification, repair, improvement, removal, conversion, change of occupancy, and demolition of any building or structure regulated by this Code.

Building360 interpretation — not legal advice: The Building Official is the authority empowered to receive and process all building permit and occupancy certificate applications under the Code.

Page 19
Bangladesh National Building Code (BNBC) 2020 UNVERIFIED
Section Part II, Section 25 — Violation and Penalties
Any person, firm, corporation or government department or agency who as owner of the property erects, constructs, enlarges, alters, repairs, moves, improves, removes, converts, demolishes, equips, uses, occupies or maintains any building or structure or permits or allows the same to be done in violation of this Code shall be subjected to penalties prescribed by law.

Building360 interpretation — not legal advice: Construction without a valid permit, or in violation of permit conditions, is subject to legal penalties under the Building Construction Act 1952.

Page 22
Bangladesh National Building Code (BNBC) 2020 UNVERIFIED
Section Part II, Section 3.2.2 — Permits Obtained Prior to Adoption of Code
If permit for a building or structure or a work regulated by this Code is obtained before adoption of this Code and the building or structure or work for which the permit is obtained is not completed within three years from the date of issuance of such permit, the said permit shall be deemed to have lapsed and fresh permit shall be necessary to proceed further with the work in accordance with the provisions of this Code.

Building360 interpretation — not legal advice: Permits issued under the previous building code lapse after three years if the work is not completed, requiring a fresh application under BNBC 2020.

Page 24
Bangladesh National Building Code (BNBC) 2020 UNVERIFIED
Section Part II, Section 3.5.2 — Deemed Approval
If the Building Official does not notify the applicant of such approval or refusal within this specified period, the application shall be deemed to have been approved provided the fact is brought to the notice of the Building Official.

Building360 interpretation — not legal advice: Applications for building permits and occupancy certificates are deemed approved if the Building Official does not respond within the prescribed time, provided the applicant brings this to notice. This deemed approval does not override other regulations or the Code.

Page 26
Bangladesh National Building Code (BNBC) 2020 UNVERIFIED
Table Part II, Table 2.3.3 — Building Classification Based on Height, Floor Area and Occupancy Type
Category I: Up to 2 Stories or 8m height, Up to 250 m2; Category II: Up to 5 Stories, Up to 1000 m2; Category III: Up to 10 stories or 33m height, Up to 7500 m2; Category IV: Any height, Any Size, All Occupancy Type

Building360 interpretation — not legal advice: Building categories determine the level of professional qualification required for design and supervision. Category IV (any height, any size) requires the highest qualified professionals.

Page 27
Bangladesh National Building Code (BNBC) 2020 UNVERIFIED
Section Part II, Section 3.10 — Inspection
All works relating to a building or structure regulated by the provisions of this Code for which permits are required shall be subject to inspection by the Building Official.

Building360 interpretation — not legal advice: Permitted construction work is subject to mandatory inspection by the Building Official at various stages.

Page 30

Approval Details

Type
Permit
Issuing Authority
RAJUK
Lifecycle Phase
Pre-Fitout
Typical Lead Time
~45 days
Validity
2 years (extendable)
Applies To
All building types

Requirements may vary by jurisdiction and project. Always confirm with the issuing authority.
Was this page helpful?
|

Stay informed

Building safety, compliance and operational readiness updates — direct to your inbox.

We respect your privacy. Unsubscribe at any time.