Construction of the building has been authorised by the relevant development authority.
What to Verify
Permit number, validity dates, approved plans match construction, any conditions of approval, extension if expired.
Internal Consistency Checks
Plot number must match title deed. Approved floors must match structural design report. Setback dimensions must match architectural drawings. Applicant name should match title deed holder or authorised representative.
Document Details
Category
Construction & Testing
Trust Level
Must Sight
Original document must be physically sighted and checked.
Disqualification Power
High
Who Issues
RAJUK / Development Authority
Typical Format
Authority permit document
Lifecycle Phase
Pre-Fitout
Renewal
No — one-time document