Structural Design Report

Planning & Design Must Verify Pre-Fitout

What It Proves

Building has been designed to withstand specified loads including dead, live, wind and seismic per BNBC.

What to Verify

Design code referenced (BNBC 2020), seismic zone, soil parameters match soil report, load assumptions documented.

What to Check On-Site

Compare visible column sizes/spacing to structural drawings. Count floors against report. Note any visible structural modifications not reflected in the report.

Internal Consistency Checks

Floor count must match architectural drawings. Foundation type must match soil investigation recommendations. Building footprint must match site plan.

Used By Approvals

As Application Input

Legal Basis

Bangladesh National Building Code (BNBC) 2020 UNVERIFIED
Table Part II, Table 2.3.3 — Building Classification Based on Height, Floor Area and Occupancy Type
Category I: Up to 2 Stories or 8m height, Up to 250 m2; Category II: Up to 5 Stories, Up to 1000 m2; Category III: Up to 10 stories or 33m height, Up to 7500 m2; Category IV: Any height, Any Size, All Occupancy Type

Building360 interpretation — not legal advice: Building categories determine the level of professional qualification required for design and supervision. Category IV (any height, any size) requires the highest qualified professionals.

Page 27
Bangladesh National Building Code (BNBC) 2020 UNVERIFIED
Section Part I, Section 5(3) — Expressed Intent of the Code
The expressed intent of this Code is to ensure public safety, health and general welfare insofar as they are affected by the construction, alteration, repair, removal, demolition, use or occupancy of buildings, structures or premises, through structural strength, stability, means of egress, safety from fire and other hazards, sanitation, adequate light, ventilation and energy conservation.

Building360 interpretation — not legal advice: This section defines the scope and purpose of the BNBC, covering structural, fire safety, egress, sanitation, ventilation, and energy conservation requirements.

Page 2

Document Details

Category
Planning & Design
Trust Level
Must Verify
Document must be independently verified with the issuing authority.
Disqualification Power
High
Who Issues
Structural Engineer
Typical Format
Engineering calculation report
Lifecycle Phase
Pre-Fitout
Renewal
No — one-time document
Non-Inferable
This document cannot be inferred from downstream certificates. Must be independently verified.

Document requirements may vary. Always confirm with the issuing authority.
Was this page helpful?
|

Stay informed

Building safety, compliance and operational readiness updates — direct to your inbox.

We respect your privacy. Unsubscribe at any time.