Skip to main content

Occupancy Certificate

Plain-Language Definition

An official document issued by the local building authority (e.g., RAJUK in Dhaka) confirming that a completed building complies with approved plans and is safe for the intended use and occupancy.

Technical Context

An occupancy certificate (also called certificate of occupancy or completion certificate) is issued after final inspection confirms: construction matches approved drawings, structural completion is verified, fire safety systems are installed and tested, electrical and plumbing installations meet code, lift installation is certified, and the building meets the conditions of the original construction permit. In Bangladesh, RAJUK issues occupancy certificates under the Building Construction Act 1952 and Dhaka Metropolitan Building Construction Rules 2008. The process requires: application with as-built drawings, inspection by RAJUK engineers, clearances from FSCD (fire), WASA (water/sewerage), and utility providers. Many existing Dhaka buildings lack occupancy certificates — this is a significant red flag for due diligence but common in the market.

Why It Matters

Operating a building without an occupancy certificate is technically illegal and creates significant liability for the owner and occupier. For multinational tenants, absence of an occupancy certificate is often a deal-breaker or requires formal risk acceptance. Insurance coverage may be void if the building lacks proper approvals.

Related Articles

Explore in-depth articles related to this topic in the Knowledge Library.

Search Knowledge Library →

Stay informed

Building safety, compliance and operational readiness updates — direct to your inbox.

We respect your privacy. Unsubscribe at any time.