Search Building360
Find articles, glossary terms, authorities, standards, approvals, frameworks and more.
5 results for “Due Diligence” in International · Handover stage
Why As-Built Information Matters
As-built drawings and records document what was actually constructed, which may differ from the original design. This information is essential for safe maintenance, renovation and assessment.
As-Built Drawings Explained
As-built drawings record what was actually constructed, which may differ from the original design. They are among the most important and frequently missing building documents.
Building Handover: What to Check, What to Demand, and What Usually Goes Wrong
The building handover process from construction to operations including practical completion, defects liability period, snagging, required documents, common failures, and what FM teams should demand before accepting a building.
MEP As-Built Documentation
Why mechanical, electrical, and plumbing as-built drawings and documentation are essential for building operations, maintenance, and due diligence, with guidance on what should exist and how to verify accuracy.
PCA
Property Condition Assessment — a systematic evaluation of a building's physical condition, covering structure, envelope, MEP systems, fire protection, site, and interior finishes. The standard methodology for building due diligence.