Skip to main content

Search Building360

Find articles, glossary terms, authorities, standards, approvals, frameworks and more.

11 results for “HVAC” · Handover stage

International (4) Handover (4) × Clear
article

Why As-Built Information Matters

As-built drawings and records document what was actually constructed, which may differ from the original design. This information is essential for safe maintenance, renovation and assessment.

article

Building Handover and Defects Liability

The handover from construction to operation is a critical transition. Understanding what should happen during handover helps ensure that the building is properly documented and free of significant defects.

article

As-Built Drawings Explained

As-built drawings record what was actually constructed, which may differ from the original design. They are among the most important and frequently missing building documents.

article

MEP As-Built Documentation

Why mechanical, electrical, and plumbing as-built drawings and documentation are essential for building operations, maintenance, and due diligence, with guidance on what should exist and how to verify accuracy.

glossary

Commissioning

The systematic process of verifying that all building systems — HVAC, electrical, plumbing, fire protection, BMS — are installed correctly, calibrated, and perform according to design intent and the owner's operational requirements.

glossary

BMS (Building Management System)

A computer-based control system that monitors and manages a building's mechanical, electrical, and plumbing systems including HVAC, lighting, fire alarm, and access control.

glossary

TAB (Testing, Adjusting and Balancing)

The process of measuring, adjusting, and verifying the performance of HVAC systems to ensure that design airflow rates, water flow rates, and temperatures are achieved at every outlet and terminal unit throughout a building.

glossary

TAB (Testing, Adjusting, and Balancing)

The process of measuring and adjusting airflow, water flow, and system performance in HVAC systems to ensure they deliver design conditions to all zones. Performed during commissioning and periodically during building life.

building_type

Corporate Offices

Corporate office buildings house business operations ranging from small professional firms to multinational headquarters. Assessment priorities include structural adequacy for open-plan floor loading, fire compartmentation between tenancies, HVAC system performance in tropical climates, electrical capacity for IT-intensive operations, and compliance with occupancy certificates and fire licences.

building_type

Shopping Centres

Shopping centres are multi-tenant retail complexes with high public occupancy, complex fire-safety requirements, multiple means of egress, centralised building management systems, common-area maintenance obligations, and shared infrastructure including HVAC, fire suppression, vertical transportation and car parking.

building_type

Hospitals

Hospitals and healthcare facilities are complex buildings with critical infrastructure requirements including uninterruptible power, medical gas systems, infection control through HVAC, fire safety for non-ambulatory patients, radiation shielding, and compliance with healthcare-specific regulations and international standards.

Stay informed

Building safety, compliance and operational readiness updates — direct to your inbox.

We respect your privacy. Unsubscribe at any time.