Search Building360
Find articles, glossary terms, authorities, standards, approvals, frameworks and more.
19 results for “HVAC” · Planning stage
How Organisations Assess Buildings Before Leasing
The systematic process corporate occupiers use to evaluate potential office and facility buildings.
How to Evaluate Potential Office Buildings
Selecting the right office building requires systematic evaluation across technical, compliance, commercial and operational dimensions. A structured approach helps organisations avoid costly mistakes.
Pre-Lease Due Diligence
Pre-lease due diligence is the systematic process of investigating a building before signing a lease. Understanding what to examine and why helps organisations protect their interests.
Property Acquisition Due Diligence
Acquiring a building requires deeper investigation than leasing. Understanding technical due diligence for acquisition helps buyers assess true value and hidden liabilities.
Corporate Minimum Requirements for Buildings
Many organisations establish minimum requirements that buildings must meet before they will be occupied. Understanding common corporate standards helps building owners prepare for corporate tenants.
Green Leases Explained
Green leases align landlord and tenant incentives for sustainability. Understanding green lease provisions helps organisations integrate environmental commitments into their occupancy arrangements.
The Complete Building Due Diligence Guide
A comprehensive, step-by-step guide to building due diligence for leasing, acquisition, and investment — covering structural, fire, MEP, environmental, regulatory, and documentation assessment with specific metrics, standards, and Bangladesh context.
Site Selection Criteria: The Professional's Evaluation Framework
A structured framework for evaluating office, factory, and warehouse sites — covering location, structural adequacy, safety compliance, power reliability, environmental risk, accessibility, and the gap between MNC expectations and local market reality.
DoE: Environmental Clearance, Pollution Control, and Green Compliance in Bangladesh
Complete guide to the Department of Environment (DoE) — environmental clearance categories, application process, EIA/EMP requirements, pollution standards, generator emission testing, and practical guidance for buildings and industrial facilities.
Office Site Selection Criteria: MNC and Professional Evaluation Framework
Comprehensive evaluation framework for office site selection — structural adequacy, fire compliance, power reliability, lift quality, parking, floor plate efficiency, security, accessibility, and how MNC standards differ from local norms.
Building Purchase Due Diligence: Complete Acquisition Checklist for Bangladesh
Comprehensive due diligence framework for purchasing an existing building in Bangladesh — structural assessment, MEP evaluation, legal verification, financial analysis, compliance gap assessment, and the complete checklist for making a defensible acquisition decision.
Green Leases and Sustainability Clauses
How green lease clauses align landlord and tenant sustainability objectives, covering energy targets, data sharing, fit-out standards, and enforcement mechanisms.
Commissioning
The systematic process of verifying that all building systems — HVAC, electrical, plumbing, fire protection, BMS — are installed correctly, calibrated, and perform according to design intent and the owner's operational requirements.
BMS (Building Management System)
A computer-based control system that monitors and manages a building's mechanical, electrical, and plumbing systems including HVAC, lighting, fire alarm, and access control.
TAB (Testing, Adjusting and Balancing)
The process of measuring, adjusting, and verifying the performance of HVAC systems to ensure that design airflow rates, water flow rates, and temperatures are achieved at every outlet and terminal unit throughout a building.
TAB (Testing, Adjusting, and Balancing)
The process of measuring and adjusting airflow, water flow, and system performance in HVAC systems to ensure they deliver design conditions to all zones. Performed during commissioning and periodically during building life.
Corporate Offices
Corporate office buildings house business operations ranging from small professional firms to multinational headquarters. Assessment priorities include structural adequacy for open-plan floor loading, fire compartmentation between tenancies, HVAC system performance in tropical climates, electrical capacity for IT-intensive operations, and compliance with occupancy certificates and fire licences.
Shopping Centres
Shopping centres are multi-tenant retail complexes with high public occupancy, complex fire-safety requirements, multiple means of egress, centralised building management systems, common-area maintenance obligations, and shared infrastructure including HVAC, fire suppression, vertical transportation and car parking.
Hospitals
Hospitals and healthcare facilities are complex buildings with critical infrastructure requirements including uninterruptible power, medical gas systems, infection control through HVAC, fire safety for non-ambulatory patients, radiation shielding, and compliance with healthcare-specific regulations and international standards.