Verification Checklist
Structured verification ordered by disqualification power. Each document is paired with what to observe on-site and what consistency checks to apply.
Educational Tool: This checklist is for educational and self-assessment purposes. It does not constitute professional verification, audit or certification. Document requirements vary by jurisdiction and building type.
Pre-Fitout
Check before construction and fitout. · 11 documentsBuilding has been designed to withstand specified loads including dead, live, wind and seismic per BNBC.
Construction of the building has been authorised by the relevant development authority.
Fire safety provisions in the building design meet FSCD requirements for the building type and height.
Building systems have been tested, balanced and verified to operate as designed under various conditions.
Building design has been reviewed and approved by the development authority for code compliance.
Electrical installation has been completed, tested and meets wiring regulation requirements.
Fire protection systems (sprinkler, alarm, suppression) have been installed as designed with any field modifications recorded.
Concrete used in construction meets the specified compressive strength at 7 and 28 days.
Foundation piles have been tested and confirmed to carry the design load with acceptable settlement.
Water supply and drainage systems have been pressure tested and are leak-free.
Reinforcement steel meets specified grade, yield strength, tensile strength and elongation requirements.
Disclaimer: This is an educational tool. Verification status recorded here is stored locally in your browser and is not transmitted to any server. This tool does not issue any form of certification. Professional verification by qualified inspectors is required for compliance purposes.